Start by considering a range of realistic future population scenarios. Lift zoning, control systems and access arrangements should be adaptable where possible.
Destination control and software upgrades can sometimes provide future flexibility without major physical changes.
Your objective is to avoid designing for an unlikely maximum while still allowing the building to accommodate reasonable changes in density or tenancy mix.





