NDY’s sustainability team was engaged to support the refurbishment and repositioning of 43–48 Dover Street in Mayfair, City of Westminster, London. Our client’s vision was to refurbish their assets to be best-in-class with requirements that included:
- BREEAM Excellent certification
- a strategy to achieve net-zero carbon in operation
- a strategy to achieve 100% renewable power
- increased biodiversity
- enhanced end-of-trip facilities.
The 52,000 ft² mixed-use office at 43–48 Dover Street was completed in 2024 by, contractor, The Thornton Partnership Ltd. Works included a refurbishment of the main reception and new end-of-trip facilities in the basement car park while retaining the entire existing building fabric.
The original design intent was a CAT A fitout to vacant floors. The project evolved at Royal Institute of British Architects Stage 4 and was, ultimately, delivered as shell and core with WC refurbishments, alongside the phased replacement and refurbishment of base-build plant and infrastructure. The completed development included a new mechanical and electrical installation with bespoke lighting.
Our sustainability team supported the project from RIBA Stages 2-6, providing:
- environmental, social, and governance (ESG) development
- peformance tracking
- BREEAM Assessor services
- BREEAM Accredited Professional services
- net-zero carbon consultancy focused on operational energy and upfront carbon.
The project was assessed against BREEAM UK RFO 2014 Offices and achieved a BREEAM Excellent rating after construction, certified by BRE. The certification demonstrates measurable outcomes such as reduced energy and water consumption, enhanced thermal comfort and reduced waste.
We developed a design-stage whole-life carbon report at Stage 3 and an as-built whole-life carbon report at the end of construction to capture the environmental impact of the development across its life cycle. We carried out the assessment in line with Royal Institution of Chartered Surveyors methodology, aligning with the Greater London Authority Whole Life Carbon Assessment Guidance.
Throughout the project, ESG priorities were maintained through staged reporting which included performance tracking and documented decision-making. We steered design choices to support our client’s aim of a net-zero trajectory, including optioneering different ceiling systems to reduce the development’s embodied carbon. The result is a benchmark Mayfair asset with performance gains and a credible path to net zero.
Project Details
Market Sector:
Offices
Client: Crosstree Real Estate Partners
Architect: GA Group
Contractor: The Thornton Partnership Ltd
Completion: 2024
Location:
London
United Kingdom